Sandplanet is currently carrying out LGS wall panel installation works at the Gulf Craft site, contributing to the development of efficient and high-performance structural systems.
The installation is being executed using precision-engineered light gauge steel components, ensuring accuracy, durability, and consistency throughout. This phase is critical in forming a robust and reliable wall system, designed to meet structural and operational requirements while allowing for faster construction timelines.
With a strong focus on quality workmanship, efficiency, and environmental responsibility, Sandplanet remains committed to delivering modern construction solutions aligned with the evolving needs of Gulf Craft’s operations.
Year : 2024
Resort : Gult Craft
Project Name : LGS Wall Panel Installation
Project Period : June 2025 (3 Months)